Guide

What a block paved driveway costs in Twickenham

Nobody enjoys a page that refuses to give a number. Here are the ranges, what moves them, and the costs that arrive after the quote if nobody mentioned them.

Every figure below is a genuine range rather than a headline price, and it is worth understanding why a range is the only honest form for this.

A driveway is priced from three things: the area, what has to come out of the ground, and what goes back in. The first is easy to measure. The second cannot be known with certainty until somebody opens a hole. The third is a specification choice.

Anyone giving you a fixed price per square metre over the phone, without seeing the frontage, is quoting the third of those and hoping about the second. That is where mid-job variations come from.

The numbers

Indicative rates for this part of London

Supplied and installed, including excavation, disposal, sub-base, laying course, blocks, edge restraint and jointing.

Indicative only. Published national guides sit lower; London typically runs 25–40% above them.
SpecificationIndicative rate per m²Notes
Standard concrete blocks
conventional build
£110–£150Straightforward ground, good access, simple rectangular layout
Permeable block paving
open-graded sub-base
£135–£200Deeper and more expensive sub-base. Usually required with a new crossover
Clay pavers
period frontages
£165–£260Hold their colour far better over decades, less forgiving of a poor base
Natural stone setts£200–£330Slower to lay, heavier, usually a conservation choice
Rough whole-job figures, standard concrete blocks, conventional build, reasonable ground and access.
DrivewayTypical areaIndicative total
Single car, terrace frontage15–20 m²£1,900–£3,200
Single car with path, semi25–35 m²£3,000–£5,400
Two cars side by side40–55 m²£4,600–£8,500
Full frontage, larger period house60–90 m²£7,000–£14,000

These are what we would expect a properly specified job to land at, not the cheapest available. A quote well below the bottom of these ranges for the same area is worth interrogating rather than celebrating.

What actually moves the price

Ranked by how much difference it makes

1. What the ground turns out to be

The single biggest variable, and the one nobody can price accurately from the pavement. Firm gravel that takes a standard sub-base is one price. Soft clay that has to be dug deeper and replaced, made ground full of old brick rubble, or a buried concrete slab that needs breaking out, is another. This is why we open a trial hole before quoting.

2. Access

A frontage a grab lorry can reach and a machine can work on costs considerably less than one where every tonne is barrowed through a gate. On some Twickenham roads, parking restrictions and permit requirements alone add a day of labour.

3. Drainage

A permeable build, a soakaway, a channel drain or a connection all cost real money, and on most new crossover applications they are not optional. A soakaway on clay is a bigger job than a soakaway on gravel.

4. Brickwork and levels

Removing and rebuilding a front wall, forming piers, or retaining a frontage that falls to the pavement is skilled work priced separately from the paving. It is frequently the difference between two quotes that look wildly apart on the same driveway.

5. The blocks

Last, deliberately. Upgrading from a standard concrete block to a premium range typically changes the total by less than most people expect, and by far less than any of the four above.

Costs that arrive later

None of these are in a paving quote unless somebody says so. On a new crossover they add up quickly.

ItemCost
Crossover application charge
Richmond upon Thames, non-refundable
£295
Crossover administration charge£674.50
Crossover construction
carried out by the council’s contractor
£2,500–£3,000
Planning application, where requiredVaries
Moving a lamp post or street furnitureVaries, often substantial

Council charges as published by Richmond upon Thames and correct to the best of our knowledge at the time of writing. Always check the current figures with the council before budgeting.

How the crossover process works

The cheapest driveway available

If your existing blocks are sound and the problem is the base, lifting and re-laying gets you a driveway that performs like new without buying the surface twice. It is routinely a third to a half less than a full replacement, and we suggest it more often than people expect.

Comparing quotes

How to read three quotes that all say the same thing

Driveway quotes have a habit of being one paragraph and a number. If that is what you have, you cannot compare them, because you are comparing prices for jobs you have not been told the specification of.

Ask all three for the same six things in writing:

  1. Excavation depth, and what happens if the subgrade is poor
  2. Sub-base material and compacted depth, and how many layers
  3. Whether spoil removal is included
  4. Edge restraint detail, and whether it is haunched in concrete
  5. Where surface water is going, and the fall
  6. Block, thickness and pattern

Any firm that will not put those on paper is telling you something useful. Any firm whose numbers then change materially is telling you something more useful still.

Cost questions

Why is London more expensive than the national figures?

Labour rates, disposal costs and access. Tipping charges in London are significantly higher than elsewhere, and a great many Twickenham frontages have no rear access, no parking for a grab lorry and a narrow gate, which means material is barrowed rather than machine-handled.

Published national guides tend to sit around £90 to £130 per square metre. Add roughly a quarter to a third for London and you are close to reality for this area.

Is the cheapest quote ever the right one?

Sometimes, if it is cheaper because the firm is smaller and has lower overheads. Usually not, because on a driveway there is only one place a large saving can come from, and that is the ground.

The test is not the total. It is whether the quote states the excavation depth, the sub-base material and depth, the number of compaction layers and where the spoil is going. If two quotes state all of that identically and one is cheaper, take the cheaper one.

Should I pay a deposit?

A deposit to cover materials is normal on a job of this size, particularly where blocks are being ordered specially. What is not normal is a large payment up front before anything has arrived on site.

Expect a modest deposit, a staged payment or two on a longer job, and the balance on completion. Ask for it in writing on the quote.

Does a driveway add value to the house?

In an area with as much parking pressure as Twickenham, off-street parking is genuinely valuable, and estate agents in the borough will tell you the same. We would not put a percentage on it, because anyone who does is guessing.

What we would say is that a badly executed driveway can subtract value, particularly on a period frontage where a wall has been removed clumsily or the paving does not suit the house.

Want a real number for your frontage?

We come and look at it, open a trial hole, measure it properly and put a written, itemised quote in front of you. Free, and no obligation.

We normally reply within 24 hours.